Glossary
Here are the most commonly used terms and abbreviations used in the reserve markets domain.
Acronym | Term | Definition |
---|---|---|
AOF | Activation Optimization Function | The role to operate the algorithm applied for the optimisation of the activation of Balancing Energy bids within a Coordinated Balancing Area. |
BEGCT | Balancing Energy Gate closure time | The point in time when submission or update of a balancing energy bid is no longer permitted |
BEGOT | Balancing Energy Gate opening time | The first point in time when submission of a balancing energy bid is permitted |
BRP | Balance Responsible Party | A market participant or its chosen representative responsible for its imbalances |
BSP | Balancing Services Provider | A market participant with reserve-providing units or reserve-providing groups able to provide balancing services to TSOs |
CIM | IEC Common Information Model | A standard for describing information about an electrical network. The European style market profile is a profile derivation from the CIM to harmonize the energy market data exchanges in Europe. |
CMOL | Common Merit Order List | A combined list of local balancing energy bid lists (MOL) from each price area maintained by the PICASSO platform |
CZC | Cross Zonal Capacity | The cross-zonal transmission capacity between two bidding zones |
FAT | Full Activation Time | The period between the activation request by the connecting TSO and the corresponding full delivery of the concerned product |
FRCE | Frequency Restoration Control Error | PICASSO platform calculates every optimization cycle a frequency restoration control error for each LFC area. This error acts as an input for the LFC optimization calculation. The sign convention is: positive value where the LFC area is in power surplus and indicates that negative aFRR balancing energy needs to be activated; and negative value where the LFC area is in power deficit and indicates that positive aFRR balancing energy needs to be activated. |
ECP | Energy Communication Platform | Reference implementation of MADES standard |
ETP | Entso-E Transparency Platform | The ENTSO-E Transparency Platform is an online data platform for European electricity system data |
ISP | Imbalance Settlement Period | The time unit for which balance responsible parties’ imbalance is calculated |
LFC | Load Frequency Control | A TSO system to maintain reasonably uniform frequency, to divide the load between the generators and to control the tie-line interchange schedules. Receives input from the PICASSO platform and distributes aFRR control signal to BSP’s within the LFC area. |
LFC AREA | Load Frequency Control Area | The control area to which the aFRR providing units or aFRR providing groups shall deliver the aFRR standard balancing energy. |
LMOL | Local Merit Order List | After the BSP GCT the TSO creates a merit order list consisting of balancing energy bids from the BSP’s in the respectitive LFC area which will be sent to PICASSO platform. Often just referred as MOL. |
MADES | Market Data Exchange Standard | Communication IEC standard designed by ENTSO-E |
MOL | Merit Order List | A list of balancing energy bids sorted in order of their bid prices, used for the activation of those bids |
MTU | Market Time Unit | The period for which the market price is established as a result of PICASSO platform optimization cycle. For PICASSO the MTU is 4 seconds. |
CC | Control Cycle | Period in which a single optimization result is calculated in LFC and new control signals (if changed from previous cycle) are sent from TSO to BSP’s |
OC | Optimization cycle | Period in which a single optimization result is calculated in PICASSO platform and new FRCE values are sent to each LFC area. Current optimization cycle is 4 seconds, equal to MTU. |
TSO | Transmission System Operator | A party that is responsible for a stable power system operation (including the organisation of physical balance) through a transmission grid in a geographical area. In the Nordic synchronous area, there are four TSOs: Svenska kraftnät, Fingrid, Energinet.dk and Statnett. |
Connecting TSO | Connecting Transmission System Operator | The TSO that operates the scheduling area in which balancing service providers and balance responsible parties shall be compliant with the terms and conditions related to balancing; |
TSO GCT | TSO energy bid submission gate closure time | The latest point in time when a connecting TSO can forward the balancing energy bids received from a balancing service provider to the activation optimisation function |
VP | Validity Period | The time period when the balancing energy bid offered by the BSP can be activated, whereas all the characteristics of the product are respected. The amount of time for which a bid is valid and firm. The first validity period of each day begins right at 00:00 market time. Validity periods are consecutive and not overlapping. The length of a single validity period is 15 minutes. |