Acronym Term Definition 
AOF Activation Optimization Function The role to operate the algorithm applied for the optimisation of the activation of Balancing Energy bids within a Coordinated Balancing Area. 
BEGCT Balancing Energy Gate closure time The point in time when submission or update of a balancing energy bid is no longer permitted 
BEGOT Balancing Energy Gate opening time The first point in time when submission of a balancing energy bid is permitted 
BRP Balance Responsible Party A market participant or its chosen representative responsible for its imbalances 
BSP Balancing Services Provider A market participant with reserve-providing units or reserve-providing groups able to provide balancing services to TSOs 
CIM IEC Common Information Model A standard for describing information about an electrical network. The European style market profile is a profile derivation from the CIM to harmonize the energy market data exchanges in Europe. 
CMOLCommon Merit Order ListA combined list of local balancing energy bid lists (MOL) from each price area maintained by the PICASSO platform
CZC Cross Zonal Capacity The cross-zonal transmission capacity between two bidding zones 
FAT Full Activation Time The period between the activation request by the connecting TSO and the corresponding full delivery of the concerned product 
FRCEFrequency Restoration Control ErrorPICASSO platform calculates every optimization cycle a frequency restoration control error for each LFC area. This error acts as an input for the LFC optimization calculation. The sign convention is: positive value where the LFC area is in power surplus and indicates that negative aFRR balancing energy needs to be activated; and negative value where the LFC area is in power deficit and indicates that positive aFRR balancing energy needs to be activated.
ECP Energy Communication Platform Reference implementation of MADES standard 
ETPEntso-E Transparency PlatformThe ENTSO-E Transparency Platform is an online data platform for European electricity system data
ISP Imbalance Settlement Period The time unit for which balance responsible parties’ imbalance is calculated 
LFCLoad Frequency ControlA TSO system to maintain reasonably uniform frequency, to divide the load between the generators and to control the tie-line interchange schedules. Receives input from the PICASSO platform and distributes aFRR control signal to BSP’s within the LFC area.
LFC AREALoad Frequency Control AreaThe control area to which the aFRR providing units or aFRR providing groups shall deliver the aFRR standard balancing energy.
LMOLLocal Merit Order ListAfter the BSP GCT the TSO creates a merit order list consisting of balancing energy bids from the BSP’s in the respectitive LFC area which will be sent to PICASSO platform. Often just referred as MOL.
MADES Market Data Exchange Standard Communication IEC standard designed by ENTSO-E 
MOL Merit Order List A list of balancing energy bids sorted in order of their bid prices, used for the activation of those bids 
MTU Market Time Unit The period for which the market price is established as a result of PICASSO platform optimization cycle. For PICASSO the MTU is 4 seconds.
CCControl CyclePeriod in which a single optimization result is calculated in LFC and new control signals (if changed from previous cycle) are sent from TSO to BSP’s
OCOptimization cyclePeriod in which a single optimization result is calculated in PICASSO platform and new FRCE values are sent to each LFC area. Current optimization cycle is 4 seconds, equal to MTU.
TSO Transmission System Operator A party that is responsible for a stable power system operation (including the organisation of physical balance) through a transmission grid in a geographical area. In the Nordic synchronous area, there are four TSOs: Svenska kraftnät, Fingrid, Energinet.dk and Statnett. 
Connecting TSOConnecting Transmission System OperatorThe TSO that operates the scheduling area in which balancing service providers and balance responsible parties shall be compliant with the terms and conditions related to balancing; 
TSO GCT TSO energy bid submission gate closure time The latest point in time when a connecting TSO can forward the balancing energy bids received from a balancing service provider to the activation optimisation function 
VPValidity PeriodThe time period when the balancing energy bid offered by the BSP can be activated, whereas all the characteristics of the product are respected. The amount of time for which a bid is valid and firm. The first validity period of each day begins right at 00:00 market time. Validity periods are consecutive and not overlapping. The length of a single validity period is 15 minutes.